Sunol Water Treatment Plant Improvements

The $110M Sunol water treatment plant project consists of construction of a 40 MGD sedimentation and flocculation basin, modification to flow distribution structure, upgrade of filters, new filtered water and backwash piping, 3 million gallon chlorine contact tank (CCT),17.5 MG Treated Water Reservoir (TWR), new chemical feed system with tanks, pumps and piping for TWR, new standby generator and fuel tanks, upgrade of electrical system and I & C, replacement of butterfly valves, new 78"pipeline and tunnel, miscellaneous piping, site excavation, and grading. CPM provides CPM scheduling, quality assurance, cost estimating, contract administration, office engineering, inspection, and claims support services on this project.

Client/Agency: City and County of San Francisco Public Utilities Commission
Cost: $110M
Services Provided: CPM scheduling, quality assurance, cost estimating, contract administration, office engineering, inspection, and claims support