Project Description

PROJECT

Laguna Honda Hospital Replacement Program

CLIENT

San Francisco Public Works

Construction Budget

$480M

Size

987,00 sf

Services:
  • Contract Administration
  • Field Engineering
  • Quality Assurance
  • Construction Management
  • Cost Estimating
  • CPM Scheduling
  • Claims Management
  • Project Controls

About

The Laguna Honda Hospital Replacement Project involved the demolition and replacement of some of the existing facilities at the Laguna Honda Hospital and Rehabilitation Center. The project included: 1) demolition of all existing hospital facilities except the front wings of the Main Hospital Building; 2) construction of four new hospital buildings; 3) construction of an assisted living facility; and 4) expansion of existing outpatient programs and services. The new construction and existing buildings total approximately 987,000 gross square feet (gsf) (an increase in building area of 282,500 gsf) and can accommodate 1,200 hospital beds (an increase of 135 beds), plus 140 assisted living beds.

The new Laguna Honda Hospital and Rehabilitation Center received silver certification by the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) program on June 18, 2010 and became the first green-certified hospital in California.