Project Description

PROJECT

Terminal 3 West Modernization Project

CLIENT

San Francisco International Airport

Construction Budget

$1B

Services:
  • Construction Management
  • Project Controls
  • CPM Scheduling
  • Office Engineering
  • Field Inspection

SFO T3 West

About

The Terminal 3 West Improvements Project aims to renovate the western half of Terminal 3 to achieve an exceptional level of passenger experience. The existing five domestic gates along the western face of Terminal 3 will be upgraded to allow flexibility to accommodate both international and domestic flights with a combination of up to three wide-bodied aircraft swing gates and up to five domestic gates capable of accommodating narrow-bodied aircraft. CPM is providing construction management, resident engineering, office engineering, construction inspection, and CPM scheduling.